In 2002, NIH assigned cost comparison requirements to each IC based
on their relative size at NIH (based on total FTE). NIH completed these
reviews and received a passing grade. In 2003 and beyond, NIH is conducting
reviews in a corporate fashion, meaning that a given function is completely
reviewed wherever it exists at NIH, regardless of the size of the IC.
|